Bryant Lewis, Author at Superior Rigging & Erecting Co. https://superiorrigging.com/author/b-lewissuperiorrigging-com/ Crane rental, rigging, steel erection and more. Since 1952. Thu, 09 Jul 2026 19:55:23 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.4 https://superiorrigging.com/wp-content/uploads/2024/05/cropped-Favicon-32x32.webp Bryant Lewis, Author at Superior Rigging & Erecting Co. https://superiorrigging.com/author/b-lewissuperiorrigging-com/ 32 32 Superior Adds SPMT’s to Heavy Transport Fleet https://superiorrigging.com/superior-adds-spmts-to-heavy-transport-fleet/ https://superiorrigging.com/superior-adds-spmts-to-heavy-transport-fleet/#respond Thu, 09 Jul 2026 18:39:13 +0000 https://superiorrigstg.wpengine.com/?p=9349 Superior Rigging & Erecting Co. is proud to announce the addition of two Cometto Self-Propelled Modular Transporter (SPMT) modules to our fleet, expanding our heavy transport and specialized hauling capabilities. Each module features 100,000 pounds of capacity per axle, allowing the combined system to move exceptionally heavy loads with precision and control. With 360-degree steering, […]

The post Superior Adds SPMT’s to Heavy Transport Fleet appeared first on Superior Rigging & Erecting Co..

]]>

Superior Rigging & Erecting Co. is proud to announce the addition of two Cometto Self-Propelled Modular Transporter (SPMT) modules to our fleet, expanding our heavy transport and specialized hauling capabilities.

Each module features 100,000 pounds of capacity per axle, allowing the combined system to move exceptionally heavy loads with precision and control. With 360-degree steering, modular configurations, and the ability to navigate confined job sites, Cometto SPMTs are an ideal solution for projects where conventional transportation methods aren’t practical.

Whether it’s relocating heavy equipment, transporting oversized components, or navigating challenging site logistics, our new SPMTs provide the flexibility and maneuverability needed to tackle complex moves.

Our Cometto SPMTs are now available for operated rental, and we’re excited to put them to work for our customers.

Watch the video below to see our new SPMTs in action and learn more about their capabilities.

The post Superior Adds SPMT’s to Heavy Transport Fleet appeared first on Superior Rigging & Erecting Co..

]]>
https://superiorrigging.com/superior-adds-spmts-to-heavy-transport-fleet/feed/ 0
Why Turnkey Steel Solutions Are the Key to Atlanta’s Rapid Growth https://superiorrigging.com/turnkey-solutions-atlanta/ https://superiorrigging.com/turnkey-solutions-atlanta/#respond Mon, 21 Jul 2025 18:49:12 +0000 https://superiorrigstg.wpengine.com/?p=9265 Atlanta is booming with population growth, new developments, and infrastructure renovations across the city. With the population expected to grow by 1.7 million over the next 25 years and the FIFA World Cup coming to Atlanta, the demands for new construction and infrastructure updates are rising fast. Today’s large-scale projects are not just about quickly […]

The post Why Turnkey Steel Solutions Are the Key to Atlanta’s Rapid Growth appeared first on Superior Rigging & Erecting Co..

]]>

Atlanta is booming with population growth, new developments, and infrastructure renovations across the city. With the population expected to grow by 1.7 million over the next 25 years and the FIFA World Cup coming to Atlanta, the demands for new construction and infrastructure updates are rising fast. Today’s large-scale projects are not just about quickly putting steel in the air, it’s about finding ways to do it smarter, more efficiently, and more cost-effective, all while quality never gets compromised.

A typical large-scale construction project involves 25 to 30 subcontractors. Each one a potential source of delay, miscommunication, or cost overruns. While everyone focuses on the big-ticket items, it’s often miscellaneous steel such as stairs, platforms, racks, that derail timelines when not prioritized. Now more than ever Atlanta needs construction methods that reduce risk, save time, and keep quality high even under pressure. That’s where steel fabrication and more importantly, turnkey heavy lifting and delivery, become critical. Developers don’t need more vendors. They need the right partner.

The Pressure for Faster, Smarter Builds

Timelines are no longer flexible, they’re critical, especially with the World Cup and the promise of the NHL coming back. Add to that the ongoing Concourse D expansion at Hartsfield-Jackson, the busiest airport in the world, and you’ve got a perfect storm of a high stakes project where delays aren’t simply inconvenient, they can cost millions. The sheer volume, variety, and speed of projects underway have changed how the city builds. Developers and general contractors need construction methods that speed up timelines while ensuring budgets and quality are never compromised. A big part of this is working with a trusted partner and more importantly, one who can provide turnkey solutions. This is especially true when it comes to steel fabrication. Each handoff between companies handling steel reduces flexibility for adjustment. A company that both fabricates and erects steel has more control over last-minute adjustments and ensures that material is transported and installed on time. The margin for miscommunication is drastically reduced.

Pre-fabricated steel components are built off-site in controlled environments. This means teams can work around the clock without worrying about rain or site restrictions. Once these components are made, they can be delivered to the job site and lifted into place. What would take weeks to accomplish can be done in a matter of days. Installations become faster and safer through the use of prefabricated steel and turnkey solutions. The fewer hands the work passes through, the more achievable a high level of excellence becomes

Keeping the city from slowing down is vitally important. The quicker work can be completed safely and correctly, the less time a road needs to be closed. Every hour saved reduces disruption. In short, prefabricated steel allows projects to move forward without grinding the city to a halt. At the scale that Atlanta is growing, the demand for smarter construction will not slow down, it will only rise. Especially with events such as the World Cup coming to Atlanta, the pressure for a quick and quality build is on.

Meeting Atlanta’s Data Center & Tech Expansion Needs

Atlanta has established itself as a major digital hub. Over the past decade, the city has quietly become a magnet for data centers, cloud infrastructure, and tech-forward enterprises. Amazon Web Services (AWS), for example, has committed $11 billion in data center investments across Georgia. While the state may not match the scale of data-centric infrastructure seen in California or Texas, its competitive edge lies in targeted tax incentives and reduced regulatory burdens, a combination that’s drawing a wave of new development. Some of these data campuses exceed one million square feet, demanding steel structures engineered to support massive server arrays and heavy-duty cooling infrastructure.

The data center boom is not a bubble, it’s projected to accelerate for as long as the state’s energy sources can keep with it. With the advancement of AI and the need for more server space and cooling systems, data centers are only going to become more important. Building data centers isn’t easy. Developers face unique challenges around load-bearing requirements, open floor plans, tight schedules, and constant design revisions. Data centers require wide, open spaces for uninterrupted rows of servers, meaning internal columns must be minimized. Vast networks of power and cooling systems need space to move beneath the floor. Overhead, enormous HVAC units, pipe racks, generator stands, and backup systems require steel framing capable of carrying intense loads. These are not generic builds. Every square foot must be engineered for precision, strength, and efficiency.

This is where prefabricated steel becomes essential. Off-site fabrication allows key structural components, from pipe racks to generator stands, to be manufactured in parallel with site preparation. AWS invested $80 million dollars in just one project to make the site level and get it prepared for construction. By the time the jobsite is ready, the steel is already on its way, minimizing delays and on-site labor. Installation requires fewer adjustments, and the schedule remains secure. Turnkey delivery adds another layer of control. There’s less room for miscommunication or missed timelines with fabrication, transport, and installation handled under one roof. That kind of speed and predictability isn’t a luxury in data center construction. It’s the difference between staying ahead or losing millions to a missed launch window.

At Superior Rigging & Erecting, we’ve seen this urgency firsthand. Our crane teams, rigging crews, and fabrication shop support several high-priority tech infrastructure builds across Georgia. More importantly, we’re seeing a shift: developers no longer just want steel, they want partners who can deliver turnkey services, from the first weld to the final bolt.

Quality & Safety

In a dense city like Atlanta, safety is paramount due to the nature of the work at hand. Crews work alongside busy highways, near airport runways, and between occupied high-rises. A minor mistake in Atlanta can ripple into major consequences such as traffic delays, injuries, or serious structural setbacks. Steel fabrication plays a large role in reducing these risks. By building key components in controlled shop environments, rather than on chaotic job sites, crews can ensure tighter quality control. It is far easier to spot flaws in a fabrication shop than it is over 100 feet in the air.

Turnkey services also help developers have a safer job site, by having a cleaner jobsite. Oftentimes when a large number of partners are working on a project, many of them need to store their materials on-site until the time to do their part comes. But if working with a subcontractor that offers turnkey services, their materials are usually stored off-site until they can be used. A cluttered jobsite is an unsafe jobsite. Having less vendors makes the jobsite cleaner and more open, thus making it safer.

Once prefabricated components are on-site, they can be installed faster and with fewer moving parts. That reduces the amount of time that workers spend in vulnerable situations. Reducing the amount of risk during a job. Due to Atlanta’s increasing safety regulations, prefabrication ensures that materials are already up to code by the time they arrive on-site.

From a quality standpoint, prefabrication ensures that every component is made to spec. Helping eliminate delays caused by having to do work over again is paramount to keeping a job’s timeline secure. At Superior, we’ve seen firsthand how fabrication can improve safety and the quality of work on complex jobs. Our crews are able to focus on precise placement and clean execution, because the materials they’re working with were built right the first time.

Turnkey Solutions

As construction schedules tighten and project complexity grows, owners and general contractors across Atlanta are rethinking how they manage risk. The more vendors involved in a job; the more things can go wrong. It’s not uncommon for general contractors to work with 25+ partners on a large build, each one introducing risk to the schedule. More and more, they’re turning to turnkey service providers. These are companies that can deliver multiple scopes of work under one roof to simplify communication, reduce delays, and keep everything moving on schedule. Attempting to coordinate separate subcontractors for fabrication, delivery, rigging, and installation only enhances risk. All it takes is for one link in the chain to fall behind or miscommunicate before the entire project is stalled. That’s why turnkey services are becoming the go-to strategy, especially for large-scale infrastructure jobs that demand speed.

Steel fabrication is a natural fit for this approach. Especially when it comes to installing miscellaneous steel. Often, one company will handle the erection of structural steel and another will handle miscellaneous. This can lead to a slower install as a company has to fit another vendors work. Even if it’s done flawlessly, communication between the two companies is much slower than if it had all been handled under one roof.

Conclusion

The challenges general contractors face in Atlanta aren’t going away, they’re multiplying. Now more than ever, GC’s need reliable partners who can deliver consistent results. They can’t gamble anymore on juggling thirty vendors and hoping it all lines up. Turnkey providers that can handle steel fabrication are vitally important. Again, it’s not just about structural steel. Miscellaneous steel, when delayed or poorly handled, becomes the hidden killer of project schedules.

That’s why at Superior, we give it as much of our attention as anything else. Keeping the health of your timeline is essential to the Superior way, and it’s essential to any turnkey provider. You don’t need more vendors. You need the right partner. One that fabricates, delivers, lifts, and installs without the handoffs, holdups, or headaches. Whether you’re building the next data hub, airport expansion, or any tough job in between, we make it look easy.

The post Why Turnkey Steel Solutions Are the Key to Atlanta’s Rapid Growth appeared first on Superior Rigging & Erecting Co..

]]>
https://superiorrigging.com/turnkey-solutions-atlanta/feed/ 0
Superior Adds Landoll PT-40 to Fleet https://superiorrigging.com/superior-adds-pt-40/ https://superiorrigging.com/superior-adds-pt-40/#respond Mon, 14 Jul 2025 15:50:16 +0000 https://superiorrigstg.wpengine.com/?p=9260 Superior Rigging & Erecting Co. is proud to announce we’ve added a Landoll PT-40 to our existing fleet. This new forklift has a lifting capacity of 40,000 lbs. at a 24-inch load center. The operator can utilize the forks or the boom of the PT-40, increasing its versatility. All movements of the boom, including vertical […]

The post Superior Adds Landoll PT-40 to Fleet appeared first on Superior Rigging & Erecting Co..

]]>

Superior Rigging & Erecting Co. is proud to announce we’ve added a Landoll PT-40 to our existing fleet.

This new forklift has a lifting capacity of 40,000 lbs. at a 24-inch load center. The operator can utilize the forks or the boom of the PT-40, increasing its versatility. All movements of the boom, including vertical lift and horizontal reach, are controlled by a single joystick.

The PT-40’s drive and lift functions can be controlled via a wireless remote control. This allows for a single operator to observe the entire work environment without being confined to the operator’s station.

Having the option of utilizing the scoping boom or forks makes this forklift perfect for handling small picks. Whether that’s picking and setting small generators, unloading tanks off a truck with the boom, or using the forks as a lull for steel beams, the PT-40 is equipped to handle your toughest jobs.

Hauling the forklift is also made easy, its weight is perfect for using one truck to haul both the machine and the counterweight. Additionally, this forklift comes equipped with auto-leveling of the boom and a backup camera system.

The Landoll PT-40 is now available for rent at Superior Rigging & Erecting Co.

 

The post Superior Adds Landoll PT-40 to Fleet appeared first on Superior Rigging & Erecting Co..

]]>
https://superiorrigging.com/superior-adds-pt-40/feed/ 0